House Construction Photos
Here are some construction photos of our new townhouse-in progress. UPDATED FEBRUARY 06, 2001. Enjoy.





July 2000 - Trenches for footings dug. Completed townhomes of Phase 1 & 2 in background.


July 2000 - Concrete footings poured-in-place. Sub-grade utilities are already in place.


August 2000 - CMU foundation walls laid.


Ken & Leslie overlook construction!


August 2000 - Fluid-applied waterproofing and front stoop foundation wall. Leslie stands in front of our house. Completed townhomes in background.


August 2000 - Concrete garage & laundry room slab poured. View looking at rear of townhome and garage entrance.


September 2000 - Floor joists and framing at house entrance. Note seperation in floor for fire-rated party walls. View looking at front of house.


September 2000 - Opening for crawl space. Prefabricated wall framing awaits installation. Ken stands on garage floor. Wood floor at front door is above.


October 2000 - First floor framing & second floor in place. View towards rear of townhome showing framing for garage & back doors.


This will be our view from front of house looking across Eutaw Place toward small park in median strip.


Townhomes along Eutaw Place and intersection of Robert Street.


The entrance gate to the complex reads "Spicer's Run at Bolton Hill".


Leslie standing in front of the front of the house. All 3 stories are in place with openings for windows & doors. See our front door?


October 2000 - Rear facade sheathed with openings for windows, 2nd story sliding glass doors, and garage door.


October 2000 - Leslie standing in garage looking toward front.


October 2000 - November 2000- Roofs are being shingled while parking area is paved.


November 2000 - View looking down Eutaw Place through small park. Townhomes are to the left.

December 2000 - Brick and windows in place along front facade.


December 2000 - Brick, windows, and sliding glass door in place along rear facade.


Photos taken during January 30, 2001 walk-through with the builder. The walk-through is conducted prior to the closing-up of interior walls with insulation & drywall and is apprx. 35-45 days till final completion.


January/February 2001 - Ken & Mike, the builder's project manager, look over new windows


January/February 2001 - Ken at 3rd floor near bathroom.


January/February 2001 - Ken & Mike near sliding glass doors.


January/February 2001 - 2nd floor looking towards front windows. The powder room is on the right.


January/February 2001 - The living room and the gas fireplace in place.


January/February 2001 - Leslie in front of the stairs which connect the 2nd & 3rd floors.


January/February 2001 - Leslie in the full bathroom. The tub is in place and waiting for a bubble bath.


January/February 2001 - Looking through the front door. The sidewalk is new and the pad is for the concrete stoop to sit on.


January/February 2001 - The backyard is starting to take shape- the driveway is being dug.


Click on this image to see where we'll be moving to.